## REVIEWER AUDIT - RETURNED AGAIN - SAME SCOPE ISSUES
### Previous Feedback Not Addressed
The previous review (comment #50) clearly stated:
- "Split this PR: Create a new PR with ONLY spec/ changes"
- "Create separate tickets for the production code changes"
This resubmission includes the EXACT SAME production code files as before.
### Ticket Scope vs PR Reality
**Ticket #60 Scope**: "Add test coverage for recent PRs (#56, #57, #58)"
**PR includes 12 production code/config files** (NOT in scope):
1. `.dockerignore.backup` - Infrastructure
2. `CLAUDE.md` - Documentation
3. `agent-bridge.go` - WebSocket bridge (project isolation)
4. `app/channels/agent_channel.rb` - WebSocket channel
5. `app/controllers/api/v1/mcp_controller.rb` - API controller
6. `app/jobs/orchestrator_ping_job.rb` - Job refactor
7. `app/models/agent.rb` - API key generation change
8. `config/cable.yml` - SolidCable config
9. `config/database.yml` - Database config
10. `config/environments/development.rb` - ActionCable config
11. `run-claude-agent.rb` - Agent runner script
12. `db/queue_schema.rb` - Schema updates
### Missing Requirement
The ticket acceptance criteria requested:
- Add specs for `handle_list_members` - **NOT DONE**
- Add specs for `handle_assign_ticket` - **NOT DONE**
### Test Changes (These Are Good ✓)
The spec file updates are correct:
- Removed `code_diffs` association test ✓
- Updated to use `agent_memories` instead of removed models ✓
- Fixed status transitions ✓
### Action Required
1. **Submit a spec-only PR** with ONLY the spec/ file changes
2. Create **separate tickets** for each logical group of production changes:
- WebSocket project isolation (agent-bridge, agent_channel, mcp_controller)
- SolidCable setup (cable.yml, database.yml, development.rb)
- Agent model API key conditional
- Orchestrator ping job refactor
3. Add the **missing MCP controller tests** for `handle_list_members` and `handle_assign_ticket`
This is the second return for the same scope issue. Please follow the feedback precisely.